T&T: Power train confidence
Rich Gano
richgano at gmail.com
Sat Sep 6 13:29:42 EDT 2008
Today was to be the first day underway since the stbd tranny pressure plate
fix a week ago. Loaded boat with the essentials for a couple of days away
and got underway.
A few yards away from the pier, I began a test of the shaft coupling
security after changing out the opposed Allen-head set screws for
square-headed screws I could honk down on harder. The new square heads were
drilled and wired in place too, and I had given them a satisfactory backing
test in the slip.
Clear of the slip, backing on both shafts revealed movement between coupling
and shaft with both backing out of the two-inch long coupling about a
quarter inch. Neither trying to tighten the set screws nor shifting back to
the old ones solved the issue. That got a no-confidence vote from the
Admiral and me. VERY gently backed into the slip and secured. First thing
Monday morning I will be calling to the yard for haul out and then change to
a pair of split couplings. Will go ahead with new PYI dripless packings and
cutless bearings while there - may as well bite those bullets too.
Hopefully, the yard will not be tied up with hurricane insurance haul-outs
due to Ike.
Rich Gano
CALYPSO (GB-42 #295)
Southport, FL
More information about the Trawlers-and-Trawlering
mailing list