I just spoke with one of the contractors and the closure planned for November 11th through the 21st is going to be pushed back to after Thanksgiving. I was told further information should be available later today. Ted Stehle, Editor Waterway Guide/Skipper Bob Publications www.waterwayguide.com www.skipperbob.net