GL: Head configuration required on the Hudson . Erie Canal, L. Ontario, Montreal etc

MLSTRADA@aol.com MLSTRADA@aol.com
Sat Apr 7 10:22:38 EDT 2007


We are planning a trip this summer heading up the Hudson to the Erie canal,  
Oswego to Lake Ontario and Thousand Islands, Rideau to the Ottawa R. Monteal,  
Richeleu canal to Lake Champlain and back to the Hudson and home.
 
Can anyone give me the requirements in these areas for the  discharge/storage 
of the head. My system is currently set up as follows. Toilet  to a Y valve, 
one side for direct discharge overboard the other to the holding  tank. The 
holding tank has a mascerator pump and line for direct discharge and a  line for 
dockside pumpout. Can the direct overboard discharge lines from the  toilet 
and the macerator pump be closed at the thruhulls and wired shut, or is a  more 
permanent set up required in these waters.
 
Thanks for for any help.
 
Michael



************************************** See what's free at http://www.aol.com.


More information about the Great-Loop mailing list